All our Sewage Treatment Plants are installed with complete compliance with the latest “Binding Rules” and Building Regulations.

We’re experts in waste treatment plant installations in Yorkshire.

Don’t forget to check the FAQ’s at the bottom on this page!

Click here to see more installation types

Sewage Treatment Plant - Drainage Field Installation in Yorkshire

Sewage Treatment Plant Installation

Sewage Treatment Plant Installations can seem complex, ensuring the installed system meets the latest Binding Rules & Part H Building Regulations is where we specialise. 

Sewage Treatment Plants, also known as Package Treatment Plants allow for full treatment of your sewage in a single location. These are of particular benefit to install when you have a nearby watercourse or need to upgrade your Septic Tank due to the binding rules.

To have your new Sewage Treatment Plant installed give us a Call, Email or fill in the enquiry form below to get the ball rolling on waste treatment plant installation in Yorkshire.

Call us on: 01759 380646
Email: bookings@yorkshireseptics.co.uk
Yorkshire Septics logo

No water course & tight on space?

Sewage Treatment Plants have the added bonus of reducing the size of a drainage field over a traditional septic tank.

Call Us Today To Arrange A Site Visit

01759 380646

Step 1 - Pre-Construction

Before a Sewage Treatment Plant Installation can begin we will need to carry out a Site Visit. Depending on your current Drainage System this stage can also include various checks on the existing drainage network against “the binding rules”  and in some instances will require a Drainage Survey.

Step 2 - Construction Phase

Once the pre-construction phase has gathered all the information required to install your new Sewage Treatment Plant, you will be provided with a start date. On average an installation takes 5- 10 working days including any Landscaping which may have been disturbed during the installation process.

Step 3 - Completion

Upon completion of the Sewage Treatment Plant Installation our Construction Manager will visit site to sign off the work as complete. Finally the Building Control Certificates are issued for the installation.

Online Enquiries

Call us on: 01759 380646
Email: bookings@yorkshireseptics.co.uk

Frequently Asked Questions

When do I need to install a Sewage Treatment Plant?

A Sewage Treatment Plant is typically installed when you need to discharge into a water course or into a surface water main. Other uses of a Sewage Treatment Plant are when there is little room for a Drainage Field in combination with a Septic Tank. Contact us today for more information on waste treatment plant installations in Yorkshire.

I don't have room in my garden for a new Drainage Field, what do I do?

There are a few different options available, these include Drainage Mounds, Surface Water Connections & Sewage Treatment Plant Installation. Give us a call to arrange a Site Visit or for more information on waste treatment plant installation in Yorkshire.

Is my system compliant with the latest binding rules?

This question gets asked all the time, the problem is without a Compliance Survey being carried out we really can’t say for certain. The new rules are all to do with ensuring that your Drainage Network is not polluting the environment, many people and companies are getting these new rules confused with building control! there is a lot of incorrect information out there regarding old Septic Tanks and the belief that they all need upgrading to a Waste Treatment Plant, This is not the case. The rules for a private Domestic Sewage Networks is where we specialise. If you think your system is in breach of “the Binding Rules” or if your moving home click onto our Compliance Survey page or Home Movers Page to learn more. For more information on waste treatment plant installation in Yorkshire, give us a call!

I need a new sewage treatment plant but don't know which one?

We take the hassle away from you on this and choose one of a Sewage Treatment Plants based on the amount of use that is expected and one that will also ensure compliance with the latest binding rules. We can also future proof the Drainage based on what you are looking to connect onto it in the near future.

We take each Sewage Treatment Plant installation from concept through to completion, including all Environment Agency permit applications and planning permissions when required.